← Collection12 — Houston Methodist Walter Tower
12 / Mission-Critical InfrastructureHouston, Texas · 2014–2015
Walter
Tower.
Healthcare / Critical Facilities
Selected Projects · 12 / 16
WORKS ATLAS / 12
Houston Methodist Walter TowerHouston, Texas / 2014–2015
01 — The Project
Critical healthcare facilities depend on uninterrupted, carefully installed electrical systems.
Supported field safety oversight during electrical-system installation for the Houston Methodist Walter Tower development in the Texas Medical Center.
The technical portfolio describes a 22-story patient tower and a major electrical construction program.
ProjectHouston Methodist Walter Tower
LocationHouston, Texas
Assignment2014–2015
Field affiliationWalker Engineering / Safety Coordinator
03 — Professional Contribution
A contribution within
a larger effort.
- 01
Electrical installation safety
Supported safety oversight during a hospital tower’s electrical-system installation.
- 02
Critical environment
Worked within a project serving life-critical healthcare operations.
The scale is architectural.
The work is human.
Major infrastructure takes shape through many disciplines, shared responsibilities, and the work of field teams.
Houston Methodist Walter Tower / Texas